ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe

Product Details
Customization: Available
Material: Iron
Usage: Pipe Clamp
Still deciding? Get samples of US$ 20/Piece
Request Sample
Manufacturer/Factory & Trading Company
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
13
Year of Establishment
2021-01-10
  • ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe
  • ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe
  • ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe
  • ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe
  • ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe
  • ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe
Find Similar Products
  • Overview
  • Product Description
  • Related Products
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Saddle Clamp
Standard
Standard
Condition
New
Name
Saddle Clamp
Color
Blue Fbe / Epoxy Coating
Size
DN50-DN300
Transport Package
Plywood Case or Pallet
Trademark
Huazhan
Origin
Shanxi
Production Capacity
5000ton/Year

Product Description

ISO2531, EN545, EN598 Ductile Iron Saddle Clamp 

Product Description


ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe

 

Name
Ductile iron saddle clamp
Standard
ISO2531,EN545
Pressure
PN10/PN16
Body
Ductile iron with FBE ( fusion bonded epoxy) coating or Epoxy painting
Gasket
EPDM according to EN681
Bolts& nuts
SS304
Coating
Fusion boned epoxy
Package
Wooden cases and protection layer

ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di PipeISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe
 

Related Products

ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe

Packaging & Shipping

ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe

Company Profile

Shanxi Huazhan Wear-resistance Material Technology Co., Ltd. covers an area of 100000 square meters with a building area of 50000 square meters. The company has multiple pipe fitting manufacturing production lines and independent technologies such as pressing, machining, medium frequency hot pressing, cold forming, hot extrusion, and heat treatment.

In addition, in order to ensure product quality, the company is increasingly focusing on improving inspection equipment. Advanced equipment and corresponding detection capabilities are constantly being adopted, such as chemical element analysis, metal testing, physical inspection, and non-destructive testing. In addition, we use the most advanced material composition analysis equipment - direct reading spectroscopy equipment, which can directly and accurately test the chemical composition of various metal materials.

Our company produces a wide variety of industrial pipe fittings, covering elbows, tees, reducers, bends, and pipe caps. We can comply with standards such as ASTM, ANSI, JIS, DIN, and GB, covering a wide range of steel materials. The production capacity has reached 10000 tons per year. We are well aware that innovation and reform are the key to winning the market and customers, so we have always been committed to "satisfying customers" and are always at the forefront of the industry.

ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe

Certification:
ISO2531 En545 En598 Ductile Iron Threaded Pipeline Saddle Clamp Pipe Coupling for PVC/PE/Di Pipe
Service:
* Provide 7 * 24-hour service. Feel free to contact us by phone, email, instant messaging and social media.
* After receiving your inquiry, reply within 8 hours, and provide the price plan within 24 hours.
* Review and monitor project details and progress at no cost by a professional team of sales, engineers
and QC personnel.
* In the cost, production, inspection, packaging, delivery and other aspects to provide a full range of intimate services.
* Provides professional support and assurance at all stages of sales.

FAQ

1. What's your terms of payment?
30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.

 

2. What's the terms of delivery?
EXW, FOB, CFR, CIF

 
3. What's the terms of packing?
Generally,we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
 
4. What's your delivery time?
For stocks, we could transport the goods to loading port within 7 work days after we received the deposit.For production period, it usually takes about 15 days to 30 days after we received the deposit.

 
5. Could you produce according to the samples?
Yes, we can customer-made by your samples or technique drawings, we can build the mold and fixtures.

 
6. How could you guarantee your products quality?
Each piece of products is manufactured by certified workshops, inspected by us piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier